Latest news from Matthews and Leigh
06
Apr
BACK TO NEWS
Holy Trinity Church, Bolton (COMPLETED)
Matthews & Leigh was awarded a contract to undertake the groundworks package for a student accommodation development secured by Colbre Projects at Holy Trinity Church in Bolton.
The scheme involved installing a 650m2 power floated floor slab in a single pour, inside the existing church as well as new build extension works, which included:
- Augered Piling
- Reinforced Ground Beams
- Ground Floor Slabs
- First and second floor slabs consisting of metal ribdeck flooring with reinforced concrete screeds
- Drainage
- Main sewer connection – involving a road closure to construct a 6m deep manhole over an existing 900mm diameter sewer, with over-pumping to maintain the operation of the sewer during construction work
The project has been an interesting one, and required valuable experience and knowledge.
BACK TO NEWS
Holy Trinity Church, Bolton (COMPLETED)